Aquatec Maxcon logo

Aquatec Maxcon partnered with Yarra Valley Water to divert organic wastes that otherwise would go to landfill, using them to generate renewable energy.

Our tailored Waste-to-Energy facility generates enough electricity to power Yarra Valley’s neighbouring Aurora Sewage Treatment Plant (STP) and Recycled Water Plant (RWP), with surplus electricity exported to the grid.

The Challenge

Yarra Valley Water sought a sustainable upgrade to reduce landfill inputs and lower operational energy costs. The goal was to harness multiple organic waste streams and convert them into usable power and heat.

Our Solution

Aquatec Maxcon designed, built, and now operate a modular waste-to-energy plant that:

Technical Highlights

Key Benefits

Ongoing Operations & Support

Aquatec Maxcon delivered a fully commissioned facility and has provided full operations and maintenance support for the site since its 2016 go live date. AQM has been fully committed in ensuring peak performance and seamless integration with existing infrastructure.

Interested In Joining Our Team?

We encourage you to become part of a great Australian company and to join the Aquatec Maxcon team today.
© 2025 Aquatec Maxcon. All Rights Reserved. Design By Insil.
chevron-downarrow-right