Company Milestones

1970Company formation.
1972First municipal waste water equipment manufactured.
1975Shift to current principal manufacturing site in Ipswich, west of Brisbane.
19798 off 42.7m diameter clarifiers provided for Luggage Point, Brisbane.
1984First major Australian design and construct wastewater treatment plant (Cameron Bay, Tasmania, 30,000 persons).
1986First major anaerobic industrial wastewater plant completed (Golden Circle Cannery in Brisbane).
1986First municipal potable plant constructed in Brisbane.
1989First major New Zealand design and construct wastewater treatment plant (Porirua, New Zealand, 75,000 persons).
1990First contract for plant operations.
1992First Indonesian job (PT Freeport Indonesia, Irian Jaya).
1993Order for Australia’s largest municipal fine bubble diffuser contract (Geelong).
1993First major industrial process water project (Stanwell Power Station).
1994First Singapore project (Mobil Refinery).
1995First BOOT plant completed (Jakarta).
1995First design and construct project for nutrient removal (Bunbury, Western Australia. 25,000 persons).
1996First Indian project (Bombay).
1996First Vietnam project (Bac Giang).
1996Order for worldscale 2,000 litres per second potable water plant (Surabaya).
1996First Australian IC Anaerobic Reactor (NB Love Starches, Brisbane).
1998AquaBlade – first Australian fine bubble membrane diffuser and test tank.
1998First Power Station Ultra Pure Water contract (Mt. Isa).
1999First direct re-use plant from treated sewage effluent to demonstrate feasibility of processing to drinking water quality (Southeast, QLD).
1999IC anaerobic reactor and oxidation ditch for world’s largest powdered milk factory in Te Rapa, New Zealand.
2001First Australian membrane bioreactor for treatment of sewage (Magnetic Island, QLD).
2001First Alliance Contract with Maroochy Water to build a sewage plant extension.
2003Selected for Coffs Harbour Water Recycling Plant Alliance. Total value $23m.
2003First contract awarded exceeding $60m for the Brisbane Water Enviro Alliance. Upgrade of three sewage treatment plants – Oxley Creek, Sandgate and Wacol (QLD).
2004First Membrane Bioreactor installed in New Zealand in Clandeboye.
2005Awarded the Townsville Citiwater Alliance to upgrade Horseshoe Bay, Cleveland Bay and Mt. St. John Wastewater Treatment Plants.
2005Case Earth award for projects >$10m in NSW awarded for the Coffs Harbour Alliance.
Selected for repeat alliance at Maroochydore.
2005Selected for further alliance for Coffs Harbour Water Reclamation Plant and Karangi Water Treatment Plant, approximate value $80m.
2006Brisbane Water Enviro Alliance expanded to include $20m thermal sludge hydrolysis plant and $23m Wynnum Water Recycling Plant.
2006First Malaysian project - Clarifier for Selinyih Water Treatment Plant, Kuala Lumpur.
2007Selected as the principal constructor for the Brisbane Caboolture Aquifer Alliance to treat the water from six water borehole fields around Brisbane and Caboolture Shire with a contract value of $93.7m.
2008Initial orders from the Coal Seam Gas industry for 120 gas micro-turbines and MF / RO for water treatment.
2009Delivered major industrial water re-use facilities for Castlemaine XXXX, Visy Smithfield and Smiths Snackfoods.
2009Brisbane Caboolture Aquifer Alliance expanded to include the Enoggera Water Treatment Plant, three pump stations and Chlorination Plant.
2009Received Australian Institute of Project Management 2008 Project of the Year National Winner for Brisbane Water Enviro Alliance.
2010Successful commissioning of a three megawatt power station to run a reverse osmosis water treatment plant for the coal seam gas industry.
2010Further MF / RO skids for the coal seam gas industry.
2010Commissioning of Australia’s first micro-turbine power generation facility at Surbiton Park Sewage Treatment Plant in Victoria, producing renewable energy from the biogas generated from the sludge digester.
2011Successful delivery of several turnkey projects including all aspects of process, design and proving, mechanical, electrical controls and civil construction for projects in industries serving municipal water and wastewater treatment and coal seam gas membrane facilities.
2012 Commissioning of Australia's largest UV disinfection system at Melbourne's Eastern Treatment Plant.
2012Award of 30,000EP MBR plant, Ballina, NSW.
2012Increased investment in Thailand manufacturing facilities.
2012Successful completion on time of the 3.9 km of vacuum insulated pipes for QCLNG, meeting all Bechtel requirements.
2012Entered into long term supply agreement for wellhead micro-turbines for APLNG.
Successfully delivered 170 micro-turbines to remote locations for the coal seam gas industry.
 2014Successful delivery of several design and construction projects including a second brewery plant for National Foods at Tooheys in Lidcombe, NSW,  14ML/d Water Treatment Plant for Centennial Coal and wastewater treatment plants at Hughenden and Miles.
2015 Awarded first Nereda® aerobic granular sludge wastewater treatment plant at Kingaroy, QLD.
2015Selected for demonstration of Nereda® technology at Melbourne’s Western Treatment Plant.
2016Awarded Yarra Valley 100T/d biomass digestion facility; the first municipal facility of its type in Australia.  Aquatec Maxcon introduced the innovative Weltec Biopower technology to the Australian Water industry through the design and development of this facility in Victoria.  The plant won the 2017 “Best International Commercial Plant Award” by the British Anaerobic Digestion Association at the 2017 UK AD & Biogas Industry awards.
2016Completion of the Kingaroy Wastewater Treatment Plant, QLD; the  first of its kind within Australia to use ground-breaking Nereda® technology. The $25 m plant was built on time, within budget and won the 2016 Engineering Excellence Award for Projects over $10 million.
 2017Aquatec Maxcon develops a novel anaerobic Membrane Bioreactor (MBR), which in collaboration with Trisco Foods, is tested at pilot scale with excellent results. The technology is recognised by the QLD government and receives funding to increase the pilot plant to commercial demonstration scale.
2017Awarded the Black Gully Wastewater Treatment Plant design and construction project in Emerald, QLD.
2017Aquatec Maxcon receives Australian Federal Government Safety Office WHS accreditation. The Federal Safety Commissioner works with industry towards achieving the highest possible occupational health and safety standards on Australian building and construction projects.
2017Winner of the 2017 QLD Australian Water Association “Infrastructure Project Innovation Award” for the successful delivery of the Kingaroy Wastewater Treatment Plant upgrade.
2018Mr Peter Ferrando appointed to the position of Managing Director starting on 5th February 2018. Peter had over 25 years’ experience in the construction Industry, including 17 years with Aquatec Maxcon. 
2018Charters Towers Regional Council awarded Aquatec Maxcon a contract for the design and construction of a Water Treatment Plant with the output capacity of 300 L/sec, ~21 ML/day. 
2018Sydney Water selected Nereda® as the technology for the Quakers Hill Water Recycling Plant upgrade, as part of the $450 million Lower South Creek Project.
2018Maxcon Industries, the manufacturing and fabrication division of the Aquatec Maxcon Group, was presented with the Weld Australia Fabricator of the Year Award at the Australian Steel Institute Steel Industry National Excellence Awards on the 5th December.
2018Whitsunday Regional Council has awarded Aquatec Maxcon a Design and Construction contract to upgrade the Bowen Sewage Treatment Plant. The plant was upgraded to incorporate a 14,000EP Membrane Bioreactor, odour control, noise mitigation and aerobic biosolids stabilisation and recycled water facilities. 
2019University of Queensland Scholarship (Master of Engineering - Urban Water) first donated by Aquatec Maxcon.
2022Burwood Beach Aeration Plant upgraded utilising the new AquaBlade L.
2023Quakers Hills UV/OP - the first demonstration plant for Sydney Water.
2026Ms Monita Naicker appointed to the position of Managing Director on 25th May.
2026Aquatec Maxcon and Maxcon Industries merged to operate as one company under the Aquatec Maxcon name, bringing together the experience and capabilities of both businesses.

Interested In Joining Our Team?

We encourage you to become part of a great Australian company and to join the Aquatec Maxcon team today.
© 2026 Aquatec Maxcon. All Rights Reserved. Design By Insil.
chevron-downarrow-right